The facility occupies a Commercial/Retail Building that was originally constructed in the 1970's. The mechanical design met the Class 3 requirements including clean air filtration and fresh air ventilation. The project also included a luxury apartment on the second floor.
We’re here to deliver innovative, sustainable engineering solutions that help you thrive and create a reliable, resilient future.